Yellow steel structures of the CPF

SAED / Jahanpars · Azar Oil Field, Mehran

Powering the hardest field in the region.

Implementation of electrical, instrumentation and telecom operations for the Central Processing Facility (CPF) of the Azar oil field — 65,000 bbl of crude and 78 MMSCF of gas per day.

Completed
Client
SAED / Jahanpars
Location
Mehran, Ilam
Value
$7M
Duration
2018 – 2022 · 24 mo+
Workforce
180

Project overview

Within the Azar oil field development — geologically one of the most complex fields in the region — Kahroba Tavan delivered five contracts at the Central Utilities/Processing Facilities: earthing, electrical & lighting, instrumentation, transformer & switchboard installation, testing and pre-commissioning, instrument calibration and telecom.

The project completed successfully within budget and on schedule, with certificates of good performance from Jahanpars Engineering & Construction and Sarvak Azar Engineering & Development (SAED).

Scope of work

Scope in numbers.

  • Over 1,000 km of HV, MV, LV, control and instrumentation cabling — connected and tested
  • 110 LV & MV panels installed and pre-commissioned with full testing
  • Twelve power transformers (11/6.3 kV and 6.3/0.4 kV) tested and energised
  • 60,000+ m of cable ladder & tray in all sizes
  • 95+ t of electrical and instrument supports fabricated
  • 31+ km of instrument tubing, calibration and Test Loop operations
  • Site lighting, earthing and full HiPot / relay / Megger test programmes
  • Telecom & F&G systems and heat tracing works

Results

Key achievements.

  • Five parallel contracts managed with multiple disciplines
  • Tight deadlines met under strict quality standards on a remote site
  • Demonstrated expertise in complex electrical and instrumentation commissioning
  • Adherence to stringent safety standards throughout