SAED / Jahanpars · Azar Oil Field, Mehran
Powering the hardest field in the region.
Implementation of electrical, instrumentation and telecom operations for the Central Processing Facility (CPF) of the Azar oil field — 65,000 bbl of crude and 78 MMSCF of gas per day.
Project overview
Within the Azar oil field development — geologically one of the most complex fields in the region — Kahroba Tavan delivered five contracts at the Central Utilities/Processing Facilities: earthing, electrical & lighting, instrumentation, transformer & switchboard installation, testing and pre-commissioning, instrument calibration and telecom.
The project completed successfully within budget and on schedule, with certificates of good performance from Jahanpars Engineering & Construction and Sarvak Azar Engineering & Development (SAED).
Scope of work
Scope in numbers.
- Over 1,000 km of HV, MV, LV, control and instrumentation cabling — connected and tested
- 110 LV & MV panels installed and pre-commissioned with full testing
- Twelve power transformers (11/6.3 kV and 6.3/0.4 kV) tested and energised
- 60,000+ m of cable ladder & tray in all sizes
- 95+ t of electrical and instrument supports fabricated
- 31+ km of instrument tubing, calibration and Test Loop operations
- Site lighting, earthing and full HiPot / relay / Megger test programmes
- Telecom & F&G systems and heat tracing works
Results
Key achievements.
- Five parallel contracts managed with multiple disciplines
- Tight deadlines met under strict quality standards on a remote site
- Demonstrated expertise in complex electrical and instrumentation commissioning
- Adherence to stringent safety standards throughout